31.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua The facility includes framing of balconies with reinforced concrete edges, waterproofing of balconies, dedusting of ceilings, installation of plasterboard framework of internal partitions, diamond drilling of engineering holes in floor slabs, waterproofing of holes for utilities. Stained glass windows are being installed. On the 20th floor the masonry of walls made of ceramic block continues. Finishing works are underway in the mockup.