Elite Family Residence On site, the installation of decorative elements on the eastern facade, application of decorative coating, installation of metal balcony railings (preparation for painting), waterproofing of terraces on the western side, reinforcement of the retaining wall, plumbing works. On the ground floor – puttying. On the first floor – covering the ceilings with plasterboard in the bathrooms. On the fifth floor – plastering.