Wyndham Grand Batumi Gonio. Aqua 1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Arrangement of curbs for stained glass windows Formwork is installed, concrete is poured and compacted. After the concrete has gained strength, the formwork is dismantled and the stained glass windows are installed. 3. Arrangement of mocap, 12th floor Allows visualization and verification of the design and materials of the hotel room. 4. Facade arrangement, 4,6,7 floors Facade works on balconies. 5. Ceramoblock masonry Verification of all dimensions and compliance with technological norms. 6. Manufacture of decorative boxes